Consultancy Services for Preparation of Feasibility Report for two laning (i) Borawas to Kaludi length – 38 Km. (the “Highway-I”), (ii) Mundra to Desuri length – 28 Km. (the “Highwy-II”), (iii) Deoli to Kanwas length – 10 Km. (the “Highway-III”), (iv) Kapren to Baran length – 70 Km. (the “Highway-IV”), totaling length – 128.932 Km (the project) through Public Private Partnership (the “PPP”) on Design, Build, Finance, Operate and Transfer (the “DBFOT”) basis under Package-EWC-S. Total length – 128.39 Km, 2-Lane, Project Cost – 345.08 Cr.
Nature of project:Detailed Project Report
Name of Client:Public Works Department, Rajasthan
Length: 128.932 Km
Estimated capital cost of Project (in Rs. crores): 345.08 Crores